PROJECT PIRDOP THERMAL GASIFICATION PLANT

PIRDOP, COORDINATES 42 Β° 42’46.4 “N 24 Β° 10’18.8” E

  • DESCRIPTION

Installation for thermal gasification for production of electricity and heat from renewable energy source – biomass. The installation has an installed capacity of 1000 kW and uses waste wood from logging and forestry activities as a resource.

The synthesis gas produced by the installation is cooled and cleaned of tars and resins, then fed to an internal combustion engine with a generator for the production of electricity and heat. The electricity will be supplied to the local network managed by CEZ.

The heat energy can be sold locally to timber manufacturers for wood drying or used by the operator of the installation to dry the sawdust fed to the reactor.

Installation for thermal gasification for production of electricity and heat from renewable energy source – biomass. The installation has an installed capacity of 1000 kW and uses waste wood from logging and forestry activities as a resource.

The synthesis gas produced by the installation is cooled and cleaned of tars and resins, then fed to an internal combustion engine with a generator for the production of electricity and heat. The electricity will be supplied to the local network managed by CEZ.

The heat energy can be sold locally to timber manufacturers for wood drying or used by the operator of the installation to dry the sawdust fed to the reactor.

  • ADDRESS
PIRDOP, COORDINATES 42 Β° 42’46.4 “N 24 Β° 10’18.8” E

PROJECT PIRDOP THERMAL GASIFICATION PLANT

  • ADDRESS
PIRDOP, COORDINATES 42 Β° 42’46.4 “N 24 Β° 10’18.8” E
  • CONTACT PERSON
  • Email: mihov@darikimoti.bg
  • Telephone: 0885520194